Every finishing defect audit ends at the same place: the surface before the finish. Oils, buffing compound, oxide and handling soils survive dip degreasing — and reappear as adhesion failures, pits and rejects.
Misonics systems deliver finishing-grade cleanliness ahead of plating, anodising, painting and coating — with the endpoint defined and testable, not assumed.
Waxy abrasive residues packed into detail — the classic pre-plate failure.
Films that survive dip tanks and reappear under coatings.
On aluminium and steel ahead of anodising and plating.
At joints where coating failure starts.
Fingerprints that become anodising stains.
Coated and painted components photographed as received and after a documented cycle. Drag the handle across to compare.
Bearing housing hub. Housing bores are a fit, not a finish. Clean without touching the dimension.
Same trials, photographed separately


Painted flange plate. Coating off the whole plate, including the bore and the bolt holes, without blasting the substrate.
Paint and powder do not fail in the film — they fail at the surface underneath it. Drawing compounds, machining oils, weld smoke, polishing pastes and handling residues are invisible at spray time and unmissable six months later: fisheyes, pinholes, poor flow-out and coatings that peel from the substrate. Solvent wiping moves contamination around; immersion ultrasonics removes it — from every face, hole and fold — to a condition you can test and record.
Degrease, rinse and dry as a defined process step before phosphate, conversion coating or direct powder application.
A cleaned surface holds an unbroken water film — a simple, honest pass/fail test for paint-ready cleanliness on the shop floor.
Chemistry, concentration, temperature and cycle time are recorded parameters — every batch prepped the same way, shift after shift.
Components ahead of electroplating — compound and oil out of detail so the deposit bonds everywhere.
Aluminium ahead of anodising — uniform, stain-free surfaces into the tank line.
Ahead of paint, powder and adhesive — where water-break-free is the entry ticket.
Bubble collapse at the liquid–metal boundary lifts contamination from passages, galleries and cavities without anything touching the surface. Nothing abrades, nothing embeds, no metal is removed.
The VarioSonic G5 tracks the transducer array as temperature and load shift — conversion efficiency up to 95%.
Eliminates standing-wave hot and cold zones across a loaded basket.
Stored recipes and logged cycles — audit evidence produced as a by-product of running.
Multi-stage filtration and weir oil capture hold results steady as the bath loads.
Most faults identified — many resolved — without a site visit.
Heavy 316 stainless tanks, tested before despatch, every wearing part replaceable.
From manually loaded single-tank units to automated lines — and engineered systems where the catalogue ends.
Pre-finish chemistry is matched to both soil and the finishing process downstream — free-rinsing formulations that leave nothing behind to interfere with deposition or adhesion.
| Component category | Specific parts / assemblies | Compatible materials |
|---|---|---|
| Pre-plate | Brass, zinc die-cast, steel parts | Substrate-specific chemistry |
| Pre-anodise | Aluminium components | Inhibited alkaline |
| Pre-paint | Fabrications, castings | Alkaline + rinse stages |
| Pre-bond | Assemblies, panels | Low-residue formulations |
| Rework | Stripped components | Per finishing system |
Where an application needs validation, we clean sample components in our laboratory, document the result, and specify the machine around the verified process. If ultrasonics is the wrong answer, the trial shows that too, and we will tell you.
In-process degreasing and pre-treatment cleaning across general fabrication and machining.
End-effectors, precision actuators and component cleaning integrated into automated lines.
Die and mould cleaning without dimensional loss — release agents, resin and scale.