Build your own tank
Four standard sizes cover most of the work. When they don't, configure exactly what you need — every choice on this page becomes a complete request for quotation.
Frequency · materials · compartments · filtration · heating — with volume and ultrasonic power calculated as you go
Configure it, and the RFQ writes itself
Work through the sections — only the dimensions are essential, everything else strengthens the quotation. Every option has an “other” where your situation doesn't fit the list. The summary card follows along and calculates the tank; Build my RFQ compiles the lot into the enquiry form at the bottom of the page.
Your configuration
1 · The part you cleanname · photos
Photos travel with your email — when the enquiry opens in your mail program, attach the files you selected here before pressing send.

2 · Contamination & current cleaningwhat comes off, and how it's done today
3 · Part dimensionsdrives the tank size
4 · Tank constructionmaterials · panels · colour
5 · Ultrasonicsfrequency · power density
6 · Compartmentsfill only the length you use
Internal partitions let you fill and heat only the zone in use — as on the HX 12.
7 · Filtration & oil handlingbags · housings · weir
Filtration runs through the Misonics filtration skid with bags rated to the deposit. A displacement weir carries floating oil off the surface continuously; a coalescer separates it for disposal.
8 · Heatingsource · temperature · heat-up
9 · Electrical & housingwhere the generators live
The generator cabinets and distribution board need to sit close to the tank — long cable runs cost power and money. The prefabricated container packages them with air-conditioning, power monitoring and surge protection in one delivered unit.

10 · Site, handling & projectcrane · bunding · timing
Your tank, as configured
Calculated figures are a guide from our platform data; the array design and every number that matters are confirmed in writing at quotation.
Why the working volume runs the economics. Ultrasonic power, heating, chemistry dosage and filtration all scale with the litres you actually fill — not the badge on the tank. That is the number this page keeps in front of you.
Heating and filtration, specified to the duty
Heating — electric or steam
Electric clamp tubes with baffles and a fitted temperature sensor where the site has no steam; a steam pipeline where it does. The calculator above sizes the electric bank to reach temperature overnight — a bigger bank buys faster heat-up, a smaller one buys nothing but waiting.
Either way it is a priced option. You are not paying for heating you will never switch on.
Filtration — the Misonics skid
Dirty draw one side, filtered return the other — the connections are standard on every tank. The Misonics filtration skid does the work: pump, bag housings and bags rated to the deposit, sized to turn the working volume over about twice an hour. Without it, you are washing the bundle in what came off it.
Retrofit later without touching the tank.
This is what the platform looks like running
A custom size is not a prototype — it is the same tank construction, transducer blocks and generator cabinets as the standard range, built to your length. This one is under test before shipping.
An UltraMax HX tank under test on the floor, transducers running.
Clip is silent and loads only when you press play.
Case studies from immersion duty
The same physics this page calculates, at work on real deposits.
Standard first, custom when it earns it
If your longest workpiece fits a standard size, buy the standard size — it is proven, priced and faster to deliver. Custom lengths are for the workpiece that doesn't fit: HX 3, HX 6, HX 9 and HX 12 up and down the range, the EvoSonic 7000 below it, and for work beyond the platform entirely — transport, automation, multi-stage lines — a CM series custom build.
Send the RFQ
Your configuration lands in the message below — add your details and send. Remember to attach the part photos to the email.
Request a quotation — custom UltraMax HX
Your configured RFQ is attached below — edit it freely. Tanks this size are quoted to site, including installation, services and the options you actually need.

Integrated work areas
Bunding to catch what comes off the load, a raised grated deck so the work happens at working height, and a screened washbay for the wet work beside the bath.
Built into the machine from the start, or as a separate unit that drops in beside one already on the floor. Quoted as its own line, ex GST.
Bunding, raised platforms and washbays →Designed, specified and supported by Misonics
Australian-owned and engineered. Built locally and internationally to Misonics drawings, specifications and testing requirements, then supported from Melbourne with parts, service and the people who wrote the process. Sold direct and through our distribution partners.

